21 October 2026
IEC 62305 Summary: The Four Parts and the 2024 Edition
A practical IEC 62305 summary: what Parts 1 to 4 cover, what changed in the 2024 third edition, and how the standard applies on French industrial sites.
20 October 2026
Lightning Rod Down Conductor Connections: A Site Guide
How to connect a lightning rod to its down conductors in France: the joints, fixings, test points and earthing that decide whether the system works and...
19 October 2026
LPS Separation Distance: How to Calculate and Respect It
Separation distance in a lightning protection system: what it is, how the NF EN 62305-3 calculation works, and what to do when space is short on French...
18 October 2026
Size IRVE for French Parking Lots With the 20% Rule
Calculate IRVE capacity for French parking from served spaces, reference power, and the 0.4 simultaneity factor, then plan the 20% T0 minimum and rollout.
17 October 2026
French Building Surge Protection: Panel or Earthing Work Can Top €600
For French building managers, simple surge protection installs cost €200 to €350; panel or earthing work can push retrofits past €600. Compare quote...
16 October 2026
Farm Hangar Lightning Protection in France: When ARF Applies
Protect a farm hangar from lightning with roof, grounding, and surge defenses. See when French rules require an ARF and how scheduled inspections help.
15 October 2026
Industrial Chimney Lightning Protection: IEC 62305 Before Hardware
Learn how IEC 62305 risk analysis shapes chimney lightning protection, from capture devices and conductors to earthing, bonding, and surge protection.
14 October 2026
Cooling Tower Lightning Protection in France: Checks Every 2 Years
See how NF EN IEC 62305-2 and French ICPE rules shape cooling tower design, including annual visual checks and full verification every two years.
13 October 2026
Listed Building Lightning Protection in France: Limit Fabric Damage
For listed buildings in France, start with an ARF and DRAC coordination before work. Learn the rules, respectful design choices, and records to keep.
12 October 2026
French Lightning Installation Certification: The DOE Is Only the Start
French facility managers can check certified installers, required studies, and final records to keep lightning protection compliant beyond installation.
11 October 2026
Enterprise EV Charger Maintenance in France: Match MA1, MA2, or MA3
Learn how French businesses can meet IRVE rules with the right MA1, MA2, or MA3 technician, preventive visits, and remote monitoring for reliable chargers.
10 October 2026
French Chemical Plant Lightning Protection Starts With ARF
French ICPE chemical plants need an ARF before protection design, followed by an ET, coordinated surge protection, and documented checks for compliance.












