27 September 2026
Avoid a Power Upgrade: IRVE Load Shedding for Owners & Facility Teams
IRVE dynamic load shedding keeps chargers usable, avoids recurring power upgrades, and links charging with surge protection and grounding checks.
26 September 2026
Prevent Lightning Induction: 5 IEC Measures for Facility Managers
Standards based workflow for engineers and facility managers: run ARF, create ET, mesh earthing, bond equipotentially, install coordinated SPDs.
25 September 2026
Why Single Earth Rods Fail for Coastal Boats and Floating Homes
Coastal grounding for boats and floating homes. Learn why single earth rods often fail, when to use a shore connected earth, and why resistivity testing...
24 September 2026
Pass French Inspections: 4 NF EN 61643 SPD Parameters to Verify
Ensure French handovers meet NF EN 61643 requirements: verify Uc, Up, In, Iimp; include edition test reports; keep the compliance dossier.
23 September 2026
Fleet Managers: Require OCPP 2.0.1 and a Profile Matrix Before Signing
Fleet managers: ensure OCPP 2.0.1 conformance, profile matrix, mTLS, clock aligned metering, migration checklist and a site audit to protect uptime and TCO.
22 September 2026
6 Pre Transfer Tank Grounding Checks for Facility Managers
Compliance first guidance for facility managers: six pre transfer tank grounding checks, a five step SOP, and the ≤10 Ω loop resistance verification...
21 September 2026
ICPE Managers: 5 Documents That Prove Lightning Conformity in France
Practical checklist for ICPE facility managers: the five documents French inspectors demand for lightning protection conformity and how to prepare them.
20 September 2026
Close Lightning Protection Reserves in France Without Costly Excavation
France-focused checklist for owners and project managers to lift lightning protection reserves: legal steps, required tests, documentation to prove...
19 September 2026
Facility Managers: ARF First Lightning Protection for Historic Sites
Start with a formal ARF. Follow EN/IEC 62305 and NF C 17-102 with standards-led design, discreet conductor routing, surge protection, and a written...
18 September 2026
Airport Lightning Protection: 3 Mistakes Facility Teams Make
Practical guidance for airport facility teams and safety engineers. Learn the three lightning failures to fix—bonding gaps, failed SPDs, broken down...
17 September 2026
French Lightning Compliance: Close Six Month, Annual, Two Year Gaps
French site managers: secure lightning compliance, get ARF and ET, schedule six month, annual and two year inspections, assign dossier owner.
16 September 2026
Under 10 Ohms: Mountain Lightning Protection Plans for Site Owners
Standards-first guide for mountain site owners and managers. Require an NF EN IEC 62305-2 risk study, Qualifoudre installers, and earthing under 10 ohms.












