p2

Prevectron3 T / Connect Module Battery Pack

Reference : P1599

The Prevectron 3 Lightning Rod Remote Module includes a long-life battery pack, which is recharged by the solar panels.  The battery pack might have to be changed after several years. It is the same Pack for Iot Connect Module or the Remote Testing T Module.

p2

Prevectron3 S60 Connect – IoT Early Streamer Emission Lightning Rod

Reference : P1543C

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7.

p2

Prevectron3 S50 Connect – IoT Early Streamer Emission Lightning Rod

Reference : P1533C

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7.

p2

Prevectron3 S40 Connect – IoT Early Streamer Emission Lightning Rod

Reference : P1523C

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7 IoT

p2

IoT Connect Module for Prevectron Early Streamer Emission Lightning Rod

Reference : P1586

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7 IoT connection.

p2

Prevectron3 TS25 Connect – IoT Early Streamer Emission Lightning Rod

Reference : P1513C

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7 IoT connection.

p2

Prevectron3 TS10 Connect – IoT Early Streamer Emission Lightning Rod

Reference : P1503C

The Lightning Innovation and Research Institute LIRI engineers have developed a new version of the PREVECTRON 3® lightning rod with real time 24/7 IoT connection.

p2

Prevectron 3 T Remote Control

Reference : P1591

The Prevectron 3 T Early Streamer Emission Lightning Rod Remote Control is dedicated to the testing of air terminals installed on a site

p2

Prevectron 3 T Module

Reference : P1580

The Remote Testing Module includes high performance batteries, encapsulated glass solar panels. It can be fitted to every Prevectron 3 Lightning Rod model.

p2

Prevectron 3 TS10 T – ESE Air Terminal with Remote Testing Module

Reference : P1503T

INDELEC proposes an innovative approach for the maintenance of its Prevectron3 TS10 Early Streamer Emission lightning rod: a modular design offering a wide range of solutions to meet all sites requirements and clients’ maintenance expectations.

p2

Prevectron 3 TS25 T – ESE Lightning Rod with Remote Testing Module

Reference : P1513T

INDELEC proposes an innovative approach for the maintenance of its Prevectron3 TS25 Early Streamer Emission lightning rod: a modular design offering a wide range of solutions to meet all sites requirements and clients’ maintenance expectations.

p2

Prevectron 3 S40 T – ESE Air Terminal with Remote Testing Module

Reference : P1523 T

INDELEC proposes an innovative approach for the maintenance of its Prevectron3 S40 Early Streamer Emission lightning rod: a modular design offering a wide range of solutions to meet all sites requirements and clients’ maintenance expectations.

p2

Prevectron 3 S50 T – ESE Air Terminal with Remote Testing Module

Reference : P1533 T

INDELEC proposes an innovative approach for the maintenance of its Prevectron3 S50 Early Streamer Emission lightning rod: a modular design offering a wide range of solutions to meet all sites requirements and clients’ maintenance expectations.

p2

Prevectron 3 S60 T – ESE Air Terminal with Remote Testing Module

Reference : P1543T

INDELEC proposes an innovative approach for the maintenance of its Prevectron3 S60 Early Streamer Emission lightning rod: a modular design offering a wide range of solutions to meet all sites requirements and clients’ maintenance expectations.

p2

Prevectron 3 S40 – ESE Air Terminal

Reference : P1523

The PREVECTRON® 3 S40 Early Streamer Emission lightning conductor combines the latest technologies: OptiMax® technology, modularity, first ever UL certified ESE air terminal, eco-design...

p2

Prevectron 3 S60 – ESE Air Terminal

Reference : P1543

The PREVECTRON® 3 S60 Early Streamer Emission lightning conductor combines the latest technologies: OptiMax® technology, modularity, first ever UL certified ESE air terminal, eco-design...

p2

Prevectron 3 TS10 – ESE Air Terminal

Reference : P1503

The PREVECTRON® 3 TS10 Early Streamer Emission lightning conductor combines the latest technologies: OptiMax® technology, modularity, first ever UL certified ESE air terminal, eco-design...

p2

Prevectron 3 TS25 – ESE Air Terminal

Reference : P1513

The PREVECTRON® 3 TS25 Early Streamer Emission (ESE)  lightning conductor combines the latest technologies: OptiMax® technology, modularity, first ever UL certified ESE air terminal, eco-design...

p2

Prevectron3 S50 – ESE Air Terminal

Reference : P1533

The PREVECTRON® 3 S50 Early Streamer Emission lightning conductor combines the latest technologies: OptiMax® technology, modularity, first ever UL certified ESE air terminal, eco-design...

p2

Prevectron 3 Tester Fast Connect Technology

Reference : P1590

The new PREVECTRON® 3 tester integrates the "Fast Connect Technology" that considerably eases the Early Streamer Emission air terminal test procedure on site without dismounting the lightning conductor.

p2

Prevectron2 TS3.40 Heritage Building – ESE Air Terminal

Reference : P1214

The ESE Lightning Conductor TS3.40 MH has been specially designed in copper to suit Heritage Buildings aesthetics requirements.

p2

Adaptor Female M20 / Female G34

Reference : C2433

Fixing PREVECTRON® on a G34 threaded pole.