11 September 2026
One Strike, One Inspection: Lightning Counters for French ICPE
How lightning impact counters confirm strikes, trigger IEC 62305 inspections, and satisfy France's ICPE recordkeeping. Selection, mounting, and...
10 September 2026
Insurers’ 2 Year Rule for Lightning Protection on French ICPE Sites
Learn the six written items insurers require for lightning cover in France, the 2 year installation deadline, and the verification schedule ICPE sites...
9 September 2026
Inspection Ready: 3 Lightning Protection Steps for French Site Managers
Apply NF EN 62305 and NFC 17-102 on French sites: set early warning, install grounding and SPDs, document stop-work and a 30 minute restart.
8 September 2026
Post 2026: 4 RFP Must Haves for NF EN 62305 in France
Post 2024, make NF EN 62305 usable in French RFPs. Require edition dates, Nd/NT report, IEC 62561/61643 certificates and a test plan.
7 September 2026
Save up to 80% on French Charging Station Costs for Fleets and Sites
Plan 2026 French fleet charging projects with real install ranges, running costs, CFN sizing to avoid Enedis upgrades, and how Advenir and regional aid...
6 September 2026
Installers: Foundation Trench Grounding That Meets NF C 15-100
Practical NF C 15-100 guidance for installers and builders: conductor sizing, 1 meter burial best practice, tellurometer testing at an accessible...
5 September 2026
4 Datasheet Checks Installers Must Do for Type 3 Surge Protectors
Actionable, standards-backed rules for installers: the four datasheet fields to verify, IEC 61643 coordination points, and wiring tips to specify and...
4 September 2026
Keep Earth Lead <0.5 m, Instrumentation Protection for Engineers
Standards-backed, field-proven steps for engineers to protect 4–20 mA, 0–10 V and binary instrumentation loops: grounding rules, SPD vs barrier...
3 September 2026
Qualify for CEE Subsidies: GTB vs GTC for French Facility Managers
Practical compliance guide for French facility managers: when GTB, not GTC, meets Décret BACS and CEE BAT-TH-116, and how to plan upgrades to qualify.
2 September 2026
4 Step CCTP Checklist to Win Lightning Protection Tenders in France
Four step CCTP and DCE checklist to find and win lightning protection tenders in France. Map NF C 17-100 and NF C 17-102, and attach DC1 and DC2.
1 September 2026
Make IEC 62305 Work on French ATEX Sites With Isolated LPS
Make IEC 62305 and IEC/EN 60079-14 actionable on French ATEX sites. Learn isolated LPS, HVI routing, Ex rated SPDs, monitored grounding, and audit-ready...
31 August 2026
Stay Under 36 kVA: IRVE Fleet Sizing for Facility Managers
Practical steps facility managers can run now: PIRVE calculation, Ks simultaneity, when 36 kVA or more than five points requires a load study, and...