23 September 2026
Fleet Managers: Require OCPP 2.0.1 and a Profile Matrix Before Signing
Fleet managers: ensure OCPP 2.0.1 conformance, profile matrix, mTLS, clock aligned metering, migration checklist and a site audit to protect uptime and TCO.
22 September 2026
6 Pre Transfer Tank Grounding Checks for Facility Managers
Compliance first guidance for facility managers: six pre transfer tank grounding checks, a five step SOP, and the ≤10 Ω loop resistance verification...
21 September 2026
ICPE Managers: 5 Documents That Prove Lightning Conformity in France
Practical checklist for ICPE facility managers: the five documents French inspectors demand for lightning protection conformity and how to prepare them.
20 September 2026
Close Lightning Protection Reserves in France Without Costly Excavation
France-focused checklist for owners and project managers to lift lightning protection reserves: legal steps, required tests, documentation to prove...
19 September 2026
Facility Managers: ARF First Lightning Protection for Historic Sites
Start with a formal ARF. Follow EN/IEC 62305 and NF C 17-102 with standards-led design, discreet conductor routing, surge protection, and a written...
18 September 2026
Airport Lightning Protection: 3 Mistakes Facility Teams Make
Practical guidance for airport facility teams and safety engineers. Learn the three lightning failures to fix—bonding gaps, failed SPDs, broken down...
17 September 2026
French Lightning Compliance: Close Six Month, Annual, Two Year Gaps
French site managers: secure lightning compliance, get ARF and ET, schedule six month, annual and two year inspections, assign dossier owner.
16 September 2026
Under 10 Ohms: Mountain Lightning Protection Plans for Site Owners
Standards-first guide for mountain site owners and managers. Require an NF EN IEC 62305-2 risk study, Qualifoudre installers, and earthing under 10 ohms.
15 September 2026
Avoid 6–12 Month Grid Delays: French Industrial IRVE and Grounding
Compliance-first guide to French industrial IRVE: start with a certified audit, avoid 6–12 month grid upgrades, and build grounding, surge protection,...
14 September 2026
French Installers: 5G Antenna Lightning Protection, GDT Coax & SPDs
French installers' checklist for 5G antenna lightning protection: GDT coax arrestors, Type 1/Type 2 SPDs, bonded earth and commissioning tests.
13 September 2026
French Installers: Avoid IRVE Retrofit Costs, NF C 15-100 Surge Rules
A norms-first checklist for French installers: identify NF C 15-100 triggers, size Iimp/Imax, keep Up ≤1 kV, and apply the 10 m local SPD rule to avoid...
12 September 2026
3 SPD Types French Installers Must Coordinate Under UTE C 15-443
Clear UTE C 15-443 guidance for French installers: when NF C 15-100 requires SPDs, how to align three SPD types, and which commissioning tests to record.












